Rail Maintenance Work at NIT – Traffic Pattern Changes on Hampton Blvd. (Jan. 18-19)

January 17, 2019

On Friday, Jan. 18, and Saturday, Jan. 19, a contractor will perform rail maintenance work at the intersection of Hampton and Terminal Boulevards, outside NIT’s South Gate.

Please be advised of the following:

  • Work is scheduled to begin after 1800 hours Friday night (after truck gate closure)
  • Work will continue overnight Friday night into Saturday morning, and may conclude before gate opening on Jan. 19
  • As work is underway, northbound traffic on Hampton Blvd., moving from ODU to NIT, will be UNABLE TO TURN LEFT into the South Gate
    • The South Gate can be accessed via Terminal Blvd. westbound (from I-64)
    • The South Gate can be accessed via Hampton Blvd. southbound (from Naval Station Norfolk)

Thank you for your flexibility.